Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(08), 715–25.

  • Type: Journal Article
  • Keywords: Repetitive projects; resource scheduling; line of balance; optimization; nonlinear mathematical programming;
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2019.1606924
  • Abstract:
    The Critical Path Method (CPM) has failed practically for scheduling repetitive projects and Line Of Balance (LOB) has emerged as an alternative for scheduling such projects. Because of the size of most repetitive projects, efficient resource management plays a vital role in their successful implementation. However, resource levelling and allocation have not been formally investigated in repetitive projects. Heuristic methods and optimization techniques have been traditionally used to solve resource scheduling problems like the latter. Although heuristic methods can handle large-size projects, they do not guarantee optimal solutions. In this paper, resource levelling and allocation problems under LOB scheme are modelled as an optimization problem that guarantees optimal solutions. Resource continuity and logical dependency between activities are maintained where constant activity progress rate is assumed. An example project is used to demonstrate the details of model formulation. A complete solution for the range of feasible project durations is obtained as a Time-Resource Trade-Off curve. A pipeline project is used to validate the developed model revealing that the developed model is superior. The proposed model provides contractors with a complete picture for resource usage along with the range of feasible project durations from which the optimal alternative can be selected.

Benjaoran, V and Peansupap, V (2020) Grid-based construction site layout planning with Particle Swarm Optimisation and Travel Path Distance. Construction Management and Economics, 38(08), 673–88.

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(08), 756–72.

Hessami, A R, Faghihi, V, Kim, A and Ford, D N (2020) Evaluating planning strategies for prioritizing projects in sustainability improvement programs. Construction Management and Economics, 38(08), 726–38.

Matar, M, Osman, H, Georgy, M, Abou-Zeid, A and Elsaid, M (2020) Evaluating the environmental performance of pipeline construction using systems modelling. Construction Management and Economics, 38(08), 689–714.

Zhang, J, Chen, F and Yuan, X (2020) Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: a Canadian study. Construction Management and Economics, 38(08), 739–55.